PAGE 5.    Pool Dig through Rough Interior  (23April2011 - 5May2011)

CLICK HERE FOR THE INDEX

THESE PICTURES ARE IN REVERSE CHRONOLOGICAL ORDER....START FROM THE BOTTOM AND WORK YOUR WAY UP.

CLICK HERE TO START AT THE BOTTOM

LAST UPDATED:  06/01/2011


5/5/2011

above:  main trunk line to attic (supply and return)


5/3/2011

above:  far better driveway conditions with new crush-n-run added yesterday

below: GEOTHERMAL lines run to the house from the wells

---


5/2/2011 Gunnite


4/29/2011

fireplace

below: chimney

above/below: master bath tub

below: the family room balcony

below: stage in theater and framework for speakers

---

above/below:  barn floor finished


4/27/2011 (pool waiting for gunnite)


4/26/2011 Pool Dig Day 2  (plumbing and steel)

---

above and below:  Geothermal well digging still in progress

below:  garage prepped for the pour


4/25/2011 The Pool Dig

below:  Geothermal well dig in progress

above:  the first geothermal line (200ft deep).    below: the core samples in 10ft increments from the surface to 110ft

below:  some yet-to-be-connected water line home runs to the manifold block in the basement

 