PAGE 5. Pool Dig through Rough Interior (23April2011 - 5May2011)
THESE PICTURES ARE IN REVERSE CHRONOLOGICAL ORDER....START FROM THE BOTTOM AND WORK YOUR WAY UP.
CLICK HERE TO START AT THE BOTTOM
LAST UPDATED: 06/01/2011
5/5/2011

above: main trunk line to attic (supply and return)
5/3/2011

above: far better driveway conditions with new crush-n-run added yesterday
below: GEOTHERMAL lines run to the house from the wells



---



5/2/2011 Gunnite




4/29/2011

fireplace

below: chimney


above/below: master bath tub

below: the family room balcony



below: stage in theater and framework for speakers

---

above/below: barn floor finished

4/27/2011 (pool waiting for gunnite)


4/26/2011 Pool Dig Day 2 (plumbing and steel)







---

above and below: Geothermal well digging still in progress

below: garage prepped for the pour


4/25/2011 The Pool Dig














below: Geothermal well dig in progress




above: the first geothermal line (200ft deep). below: the core samples in 10ft increments from the surface to 110ft

below: some yet-to-be-connected water line home runs to the manifold block in the basement